{"id":191,"date":"2023-03-24T10:11:51","date_gmt":"2023-03-24T10:11:51","guid":{"rendered":"https:\/\/solariss.llc\/?p=191"},"modified":"2026-09-29T10:32:09","modified_gmt":"2026-09-29T10:32:09","slug":"grid-connection-technical-information-obtained","status":"publish","type":"post","link":"https:\/\/solariss.llc\/sq\/general-updates\/grid-connection-technical-information-obtained\/","title":{"rendered":"Grid Connection Technical Information obtained"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"193\" src=\"http:\/\/solariss.llc\/wp-content\/uploads\/2023\/03\/KosttLogoFull-1024x193.png\" alt=\"\" class=\"wp-image-220\" srcset=\"https:\/\/solariss.llc\/wp-content\/uploads\/2023\/03\/KosttLogoFull-1024x193.png 1024w, https:\/\/solariss.llc\/wp-content\/uploads\/2023\/03\/KosttLogoFull-300x56.png 300w, https:\/\/solariss.llc\/wp-content\/uploads\/2023\/03\/KosttLogoFull-768x144.png 768w, https:\/\/solariss.llc\/wp-content\/uploads\/2023\/03\/KosttLogoFull-1536x289.png 1536w, https:\/\/solariss.llc\/wp-content\/uploads\/2023\/03\/KosttLogoFull.png 1638w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">24.03.2023, Prishtina<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Transmission, System and Market Operator (KOSTT JSC) issued the Technical Information to Solariss LLC concerning the prospective connection of the Kosuriq Solar Park to the Kosovo Transmission Network. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Though non-legally binding, this information serves as a critical basis for subsequent project planning and engineering design.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>24.03.2023, Prishtina The Transmission, System and Market Operator (KOSTT JSC) issued the Technical Information to Solariss LLC concerning the prospective connection of the Kosuriq Solar Park to the Kosovo Transmission Network. Though non-legally binding, this information serves as a critical basis for subsequent project planning and engineering design.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[],"class_list":["post-191","post","type-post","status-publish","format-standard","hentry","category-general-updates"],"_links":{"self":[{"href":"https:\/\/solariss.llc\/sq\/wp-json\/wp\/v2\/posts\/191","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/solariss.llc\/sq\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/solariss.llc\/sq\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/solariss.llc\/sq\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/solariss.llc\/sq\/wp-json\/wp\/v2\/comments?post=191"}],"version-history":[{"count":2,"href":"https:\/\/solariss.llc\/sq\/wp-json\/wp\/v2\/posts\/191\/revisions"}],"predecessor-version":[{"id":221,"href":"https:\/\/solariss.llc\/sq\/wp-json\/wp\/v2\/posts\/191\/revisions\/221"}],"wp:attachment":[{"href":"https:\/\/solariss.llc\/sq\/wp-json\/wp\/v2\/media?parent=191"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/solariss.llc\/sq\/wp-json\/wp\/v2\/categories?post=191"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/solariss.llc\/sq\/wp-json\/wp\/v2\/tags?post=191"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}