{"id":96,"date":"2026-09-29T06:51:28","date_gmt":"2026-09-29T06:51:28","guid":{"rendered":"https:\/\/solariss.llc\/?page_id=96"},"modified":"2026-10-01T14:16:47","modified_gmt":"2026-10-01T14:16:47","slug":"faq","status":"publish","type":"page","link":"https:\/\/solariss.llc\/sq\/about\/faq\/","title":{"rendered":"Frequently Asked Questions"},"content":{"rendered":"\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"2000\" height=\"300\" src=\"https:\/\/solariss.llc\/wp-content\/uploads\/2026\/10\/Website-banners_4-2.png\" alt=\"\" class=\"wp-image-530\" srcset=\"https:\/\/solariss.llc\/wp-content\/uploads\/2026\/10\/Website-banners_4-2.png 2000w, https:\/\/solariss.llc\/wp-content\/uploads\/2026\/10\/Website-banners_4-2-300x45.png 300w, https:\/\/solariss.llc\/wp-content\/uploads\/2026\/10\/Website-banners_4-2-767x115.png 767w, https:\/\/solariss.llc\/wp-content\/uploads\/2026\/10\/Website-banners_4-2-1024x154.png 1024w, https:\/\/solariss.llc\/wp-content\/uploads\/2026\/10\/Website-banners_4-2-1536x230.png 1536w\" sizes=\"auto, (max-width: 2000px) 100vw, 2000px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Frequently Asked Questions<\/strong><\/h2>\n\n\n\n<details class=\"wp-block-details has-medium-font-size is-layout-flow wp-block-details-is-layout-flow\"><summary><strong>General Information<\/strong><\/summary>\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>What is a 108 MWp solar PV project?<\/summary>\n<p class=\"wp-block-paragraph\">A 108 MWp (megawatt-peak) solar photovoltaic (PV) project is a utility-scale power generation facility designed to convert solar energy into electricity, with a nominal installed capacity of 108 MW under Standard Test Conditions (STC).<\/p>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>How much electricity will the PV plant produce annually?<\/summary>\n<p class=\"wp-block-paragraph\">A 108 MWp solar PV plant is expected to generate:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Approximately 140\u2013180 GWh per year, depending on solar irradiance, system design, and losses.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">In the Kosovo\/Balkans region, a typical annual generation range is 150\u2013165 GWh<\/p>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>How many households can this supply?<\/summary>\n<p class=\"wp-block-paragraph\">The plant can supply electricity to approximately 20,000\u201330,000 households, depending on average annual consumption per household.<\/p>\n<\/details>\n<\/details>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<details class=\"wp-block-details has-medium-font-size is-layout-flow wp-block-details-is-layout-flow\"><summary><strong>Technical Aspects<\/strong><\/summary>\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>What components are included in the project?<\/summary>\n<p class=\"wp-block-paragraph\">The main components of a utility-scale PV plant include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Photovoltaic (PV) modules<\/li>\n\n\n\n<li>Inverters<\/li>\n\n\n\n<li>Mounting structures<\/li>\n\n\n\n<li>DC and AC cabling systems<\/li>\n\n\n\n<li>Step-up transformers<\/li>\n\n\n\n<li>Substation and grid interconnection infrastructure<\/li>\n\n\n\n<li>SCADA (Supervisory Control and Data Acquisition) and monitoring systems<\/li>\n<\/ul>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>What is the expected lifetime of the plant?<\/summary>\n<ul class=\"wp-block-list\">\n<li>PV modules: 25\u201330 years<\/li>\n\n\n\n<li>Inverters: 10\u201315 years (typically replaced once during the project lifetime)<\/li>\n\n\n\n<li>Overall project lifetime: 25\u201330 years<\/li>\n<\/ul>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>What is the capacity factor?<\/summary>\n<p class=\"wp-block-paragraph\">In the Balkan region, the expected capacity factor typically ranges between 16% and 20%, depending on site-specific conditions.<\/p>\n<\/details>\n<\/details>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<details class=\"wp-block-details has-medium-font-size is-layout-flow wp-block-details-is-layout-flow\"><summary><strong>Land &amp; Environmental Impact<\/strong><\/summary>\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>How much land is required?<\/summary>\n<p class=\"wp-block-paragraph\">A 100 MWp solar PV plant typically requires approximately 100\u2013120 hectares, equivalent to 1.0\u20131.2 hectares per MWp, depending on layout and technology.<\/p>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Does the project harm the environment?<\/summary>\n<p class=\"wp-block-paragraph\">When properly designed and permitted, environmental impacts are minimal:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>No greenhouse gas emissions during operation<\/li>\n\n\n\n<li>Low noise levels<\/li>\n\n\n\n<li>Potential for dual land use (e.g., agricultural activities)<\/li>\n<\/ul>\n<\/details>\n<\/details>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<details class=\"wp-block-details has-medium-font-size is-layout-flow wp-block-details-is-layout-flow\"><summary><strong>Grid Connection &amp; Operation<\/strong><\/summary>\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>How is the PV plant connected to the grid?<\/summary>\n<p class=\"wp-block-paragraph\">The plant is typically connected to the transmission network via a 110 kV substation, in accordance with grid operator requirements.<\/p>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Does solar affect grid stability?<\/summary>\n<p class=\"wp-block-paragraph\">Solar PV introduces variability; however, impacts are manageable through:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Detailed grid impact and interconnection studies<\/li>\n\n\n\n<li>Implementation of voltage control and reactive power support<\/li>\n\n\n\n<li>Integration of Battery Energy Storage Systems (BESS) where required<\/li>\n<\/ul>\n<\/details>\n<\/details>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary><strong>Financial Aspects<\/strong><\/summary>\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>What is the approximate investment cost?<\/summary>\n<p class=\"wp-block-paragraph\">The total investment cost for a 100 MWp solar PV project is typically in the range of \u20ac60\u201370 million, depending on technology selection, market conditions, and project-specific factors.<\/p>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>What are the main cost components?<\/summary>\n<p class=\"wp-block-paragraph\">Key cost components include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>PV modules (~40\u201350% of total CAPEX)<\/li>\n\n\n\n<li>Inverters<\/li>\n\n\n\n<li>EPC (Engineering, Procurement, and Construction) services<\/li>\n\n\n\n<li>Grid connection infrastructure<\/li>\n\n\n\n<li>Land acquisition and permitting<\/li>\n<\/ul>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>What is the expected payback period?<\/summary>\n<p class=\"wp-block-paragraph\">The typical payback period is:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>10\u201312 years, depending on:<\/li>\n\n\n\n<li>Power Purchase Agreement (PPA) terms<\/li>\n\n\n\n<li>EPC costs<\/li>\n\n\n\n<li>Financing structure and cost of capital<\/li>\n<\/ul>\n<\/details>\n<\/details>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary><strong>Construction &amp; Timeline<\/strong><\/summary>\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>How long does it take to build the PV plant?<\/summary>\n<ul class=\"wp-block-list\">\n<li>Development phase (permitting, studies, financing): 3\u20135 years<\/li>\n\n\n\n<li>Construction phase: 12\u201318 months<\/li>\n<\/ul>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>What are the main project phases?<\/summary>\n<p class=\"wp-block-paragraph\">The project is typically implemented through the following phases:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Feasibility study and site assessment<\/li>\n\n\n\n<li>Permitting and regulatory approvals<\/li>\n\n\n\n<li>Financial close<\/li>\n\n\n\n<li>EPC construction<\/li>\n\n\n\n<li>Testing and commissioning<\/li>\n\n\n\n<li>Commercial operation<\/li>\n<\/ul>\n<\/details>\n<\/details>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary><strong>Operation &amp; Maintenance<\/strong><\/summary>\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>What maintenance is required?<\/summary>\n<p class=\"wp-block-paragraph\">Routine operation and maintenance activities include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Periodic cleaning of PV modules<\/li>\n\n\n\n<li>Vegetation management<\/li>\n\n\n\n<li>Electrical and mechanical inspections<\/li>\n\n\n\n<li>Inverter maintenance and servicing<\/li>\n<\/ul>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>What is the annual O&amp;M cost?<\/summary>\n<p class=\"wp-block-paragraph\">Annual operation and maintenance costs are typically approximately \u20ac10,000 per MWp per year<\/p>\n<\/details>\n<\/details>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary><strong>Risks &amp; Challenges<\/strong><\/summary>\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>What are the main risks?<\/summary>\n<p class=\"wp-block-paragraph\">Key risks associated with solar PV projects include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Regulatory and policy changes<\/li>\n\n\n\n<li>Grid constraints and potential curtailment<\/li>\n\n\n\n<li>Variability in solar resource<\/li>\n\n\n\n<li>Equipment degradation and performance risk<\/li>\n<\/ul>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>What is curtailment?<\/summary>\n<p class=\"wp-block-paragraph\">Curtailment refers to the reduction of electricity output by the grid operator due to network constraints or system balancing requirements<\/p>\n<\/details>\n<\/details>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary><strong>Social &amp; Economic Impact<\/strong><\/summary>\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Does the project create jobs?<\/summary>\n<p class=\"wp-block-paragraph\">Yes, the project contributes to job creation:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Construction phase: 150\u2013300 jobs<\/li>\n\n\n\n<li>Operational phase: 5\u201315 permanent positions<\/li>\n<\/ul>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>What are the benefits for the local community?<\/summary>\n<p class=\"wp-block-paragraph\">The project provides several local benefits, including:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Employment opportunities<\/li>\n\n\n\n<li>Infrastructure improvements<\/li>\n\n\n\n<li>Contribution to clean and sustainable energy supply<\/li>\n<\/ul>\n<\/details>\n<\/details>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary><strong>Sustainability &amp; Future Outlook<\/strong><\/summary>\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>What happens after 25-30 years?<\/summary>\n<p class=\"wp-block-paragraph\">At the end of its operational life, the project may:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Be repowered with newer, more efficient technologies<\/li>\n\n\n\n<li>Be decommissioned, with site restoration and material recycling<\/li>\n<\/ul>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Are solar PV modules recyclable?<\/summary>\n<p class=\"wp-block-paragraph\">Yes, PV modules are largely recyclable. Up to 90\u201395% of materials can be recovered and reused.<\/p>\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>What performance metrics are used?<\/summary>\n<p class=\"wp-block-paragraph\">Key performance indicators include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Performance Ratio (PR): typically, 75\u201385%<\/li>\n\n\n\n<li>Specific Yield: approximately 1,400\u20131,700 kWh\/kWp per year<\/li>\n<\/ul>\n<\/details>\n<\/details>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n","protected":false},"excerpt":{"rendered":"<p>Frequently Asked Questions<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":69,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"page-no-title","meta":{"footnotes":""},"class_list":["post-96","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/solariss.llc\/sq\/wp-json\/wp\/v2\/pages\/96","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/solariss.llc\/sq\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/solariss.llc\/sq\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/solariss.llc\/sq\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/solariss.llc\/sq\/wp-json\/wp\/v2\/comments?post=96"}],"version-history":[{"count":10,"href":"https:\/\/solariss.llc\/sq\/wp-json\/wp\/v2\/pages\/96\/revisions"}],"predecessor-version":[{"id":531,"href":"https:\/\/solariss.llc\/sq\/wp-json\/wp\/v2\/pages\/96\/revisions\/531"}],"up":[{"embeddable":true,"href":"https:\/\/solariss.llc\/sq\/wp-json\/wp\/v2\/pages\/69"}],"wp:attachment":[{"href":"https:\/\/solariss.llc\/sq\/wp-json\/wp\/v2\/media?parent=96"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}