{"id":77,"date":"2026-09-29T06:32:10","date_gmt":"2026-09-29T06:32:10","guid":{"rendered":"https:\/\/solariss.llc\/sq\/?page_id=77"},"modified":"2026-10-21T07:58:13","modified_gmt":"2026-10-21T07:58:13","slug":"home","status":"publish","type":"page","link":"https:\/\/solariss.llc\/sq\/","title":{"rendered":"Fillimi"},"content":{"rendered":"\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"2000\" height=\"300\" src=\"https:\/\/solariss.llc\/wp-content\/uploads\/2026\/10\/Website-banners_3.png\" alt=\"\" class=\"wp-image-514\" srcset=\"https:\/\/solariss.llc\/wp-content\/uploads\/2026\/10\/Website-banners_3.png 2000w, https:\/\/solariss.llc\/wp-content\/uploads\/2026\/10\/Website-banners_3-300x45.png 300w, https:\/\/solariss.llc\/wp-content\/uploads\/2026\/10\/Website-banners_3-767x115.png 767w, https:\/\/solariss.llc\/wp-content\/uploads\/2026\/10\/Website-banners_3-1024x154.png 1024w, https:\/\/solariss.llc\/wp-content\/uploads\/2026\/10\/Website-banners_3-1536x230.png 1536w\" sizes=\"auto, (max-width: 2000px) 100vw, 2000px\" \/><\/figure>\n\n\n\n<p class=\"alignwide has-x-large-font-size wp-block-paragraph\"><strong>Powering Kosovo\u2019s Energy Independence.<\/strong><\/p>\n\n\n\n<p class=\"alignwide has-large-font-size wp-block-paragraph\"><strong>Engineering Regional Resilience.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<div class=\"wp-block-columns alignwide is-layout-flex wp-container-core-columns-is-layout-794e3cfa wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:66.66%\">\n<p class=\"wp-block-paragraph\"><strong>Solariss LLC<\/strong> combines Swiss investment standards and operational rigor with deep local execution to develop, finance, and operate highly optimized renewable energy infrastructure across Kosovo.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Our mission is to strengthen the reliability of the national energy supply and advance the long-term energy transition through environmentally and socially sustainable utility-scale <a href=\"https:\/\/solariss.llc\/about\/projects\/\" data-type=\"page\" data-id=\"136\">Projects<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">By reinforcing grid stability and adhering to stringent European technical benchmarks, we build infrastructure that powers local economic growth while securing enduring value for our shareholders and host communities.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Looking ahead, Solariss is pioneering the future of the regional electricity market by transforming passive renewable generation into a flexible, resilient, and dispatchable trading hub. In response to increasing regional solar penetration, we actively mitigate price cannibalization risks through generation hybridization and strategic energy storage. This approach unlocks diversified revenue streams, including ancillary services, reserve capacity, and regional energy arbitrage, positioning Solariss as a dynamic market leader built for long-term growth in Southeast Europe.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Whether you are an institutional investor or strategic partner, join Solariss LLC in defining the next generation of energy infrastructure in Southeast Europe.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Prishtina, Kosovo<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><a href=\"https:\/\/solariss.llc\/contact\/\" data-type=\"page\" data-id=\"24\">Contact Our Development Team<\/a><\/strong> &nbsp;&nbsp;|&nbsp;&nbsp; <strong><a href=\"https:\/\/solariss.llc\/contact\/\" data-type=\"page\" data-id=\"24\">Inquire About Partnership<\/a><\/strong><\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33.33%\">\n<h1 class=\"wp-block-heading has-large-font-size\"><strong>T\u00eb fundit:<\/strong><\/h1>\n\n\n<ul class=\"wp-block-latest-posts__list has-dates wp-block-latest-posts has-medium-font-size is-layout-flow wp-block-latest-posts-is-layout-flow\"><li><a class=\"wp-block-latest-posts__post-title\" href=\"https:\/\/solariss.llc\/sq\/solar-park-kosuriq\/ero-authorizes-construction-of-99-mw-kosuriq-solar-park\/\">ERO Board approves Authorization for  Construction of 99 MW Kosuriq Solar Park<\/a><time datetime=\"2026-10-26T15:00:52+00:00\" class=\"wp-block-latest-posts__post-date\">26.10.2026<\/time><\/li>\n<li><a class=\"wp-block-latest-posts__post-title\" href=\"https:\/\/solariss.llc\/sq\/general-updates\/authorization-application-submitted\/\">Solar Park Kosuriq ready for ERO Board Authorization<\/a><time datetime=\"2026-07-18T12:00:20+00:00\" class=\"wp-block-latest-posts__post-date\">18.07.2026<\/time><\/li>\n<li><a class=\"wp-block-latest-posts__post-title\" href=\"https:\/\/solariss.llc\/sq\/uncategorized\/njoftim-publik-autorizim\/\">Njoftim Publik &#8211; Autorizim<\/a><time datetime=\"2026-07-10T10:58:45+00:00\" class=\"wp-block-latest-posts__post-date\">10.07.2026<\/time><\/li>\n<li><a class=\"wp-block-latest-posts__post-title\" href=\"https:\/\/solariss.llc\/sq\/general-updates\/expropriation-and-servitute-elaborate-submitted\/\">Expropriation Elaborate for 110 kV OHL submitted to MESP<\/a><time datetime=\"2026-06-22T13:58:41+00:00\" class=\"wp-block-latest-posts__post-date\">22.06.2026<\/time><\/li>\n<li><a class=\"wp-block-latest-posts__post-title\" href=\"https:\/\/solariss.llc\/sq\/general-updates\/application-for-authorization-submitted-to-ero\/\">Application for Authorization submitted to ERO<\/a><time datetime=\"2026-06-19T14:03:35+00:00\" class=\"wp-block-latest-posts__post-date\">19.06.2026<\/time><\/li>\n<\/ul><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Powering Kosovo\u2019s Energy Independence. Engineering Regional Resilience. Solariss LLC combines Swiss investment standards and operational rigor with deep local execution to develop, finance, and operate highly optimized renewable energy infrastructure across Kosovo. Our mission is to strengthen the reliability of the national energy supply and advance the long-term energy transition through environmentally and socially sustainable [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"page-no-title","meta":{"footnotes":""},"class_list":["post-77","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/solariss.llc\/sq\/wp-json\/wp\/v2\/pages\/77","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/solariss.llc\/sq\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/solariss.llc\/sq\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/solariss.llc\/sq\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/solariss.llc\/sq\/wp-json\/wp\/v2\/comments?post=77"}],"version-history":[{"count":29,"href":"https:\/\/solariss.llc\/sq\/wp-json\/wp\/v2\/pages\/77\/revisions"}],"predecessor-version":[{"id":575,"href":"https:\/\/solariss.llc\/sq\/wp-json\/wp\/v2\/pages\/77\/revisions\/575"}],"wp:attachment":[{"href":"https:\/\/solariss.llc\/sq\/wp-json\/wp\/v2\/media?parent=77"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}